Pro Member Downloads
Your full-report PDF and audio narration are below. These files are gated to Professional members.
- 📄 Download the full report (PDF) · 2.7 MB
- 🎧 Listen to the audio narration · 93.0 MB
![[Section Divider Image]](https://santiagocapital.com/wp-content/uploads/2026/10/b2e671c4-6e43-4d7c-bf0e-c167ab1b4dff_1320x50.webp)
LETTER TO READERS
For most of the past two years, the question everyone asked about artificial intelligence was how much of it the world would want. The answer kept getting bigger, and so did the spending. Amazon, Alphabet, Meta, and Microsoft now expect to invest between $735 billion and $750 billion this year alone.
Over the past few weeks the question has changed.
The ten-year Treasury yield climbed above 5.35% in early October, its highest level since 2002. Oracle, downgraded to the edge of junk in July, issued a force majeure notice on a 2.45 gigawatt data center project in New Mexico in September, and the cost of insuring its debt against default has since hit a record. CoreWeave’s bonds now yield more than 15%. SoftBank sold the largest high-yield bond on record to fund its stake in OpenAI. In mid-October, the Nasdaq slid to a nearly one-month low as the AI rout deepened on concerns about debt. Valuations and expectations are coming down, and the credit spreads of the companies building the AI economy are widening.
The market has stopped asking how much AI the world will want and started asking who is paying for it, at what cost, and whether the revenue will arrive in time. That is why we are publishing this report now.
But this is not a report about whether AI is a bubble. We think that question, as it is usually asked, misses the point. This report is about the one input that every data center needs and no amount of money can produce quickly: electricity. It asks how much new power demand AI will actually create, whether the American grid can deliver it, who will pay for it, and what that means for portfolios. Our answers are that the demand is real but heavily overstated, that the grid cannot deliver it on the schedule the money wants, that households are already paying, and voters are already noticing, and that financing, not demand, is the variable that decides how this ends.
We should be clear about where we stand. We believe artificial intelligence will be hugely beneficial to humanity, not just to economic output: faster drug discovery, better medicine, new materials, and scientific progress that once took decades. We are bullish on the technology. That does not mean today’s valuations are appropriate. Believing in what a technology will do and paying any price to own it are two different decisions, and the history of every great infrastructure boom is the history of people confusing them.
It belongs in this series for a reason that goes beyond the market’s current anxiety.
For the past several years we have argued that the world which produced the last four decades of investment returns is gone. In The End of Peacetime Portfolios we argued that the assumptions built into most portfolios belonged to one particular environment, built on open trade, cheap capital, and the confidence that nothing important would break. In Redundancy Before Returns we showed what thirty years of optimization had done to the margin of safety in the infrastructure developed economies run on and found that the surge capacity the United States would need to recover from an attack on its grid had already been sold to hyperscale data center developers.
This report is about that buyer.
The American grid is a peacetime asset. For fifteen years electricity demand did not grow, in part because the most power-hungry industries had moved overseas and the country imported their output instead. Utilities stopped building for growth. Manufacturers of turbines and transformers sized their factories for replacement rather than growth. Now three forces are arriving at once: the reshoring of industry, the electrification of transport and heat, and above all the data center, which Washington now treats, as we described in Genesis, as strategic infrastructure in a technological contest with China. AI is another front in the wider competition for power between the United States and China, and the United States is playing to win. That makes the electricity behind it a national security question, and it is why Washington is using permits, federal land, and emergency orders to keep the buildout moving. The demand of a new era has collided with a grid built for the old one, at a moment when the cost of capital is the highest in a generation.
To make sense of it, we have borrowed a story from the last time America rebuilt its physical network around a new technology.
The railroads of the nineteenth century were real. The country needed them, used them, and was transformed by them. They were also overbuilt, financed on borrowed money, fought over by the farmers who paid their freight rates, and brought low by a financing panic that arrived before the traffic did. Many of the companies failed. The track did not. We return to that story throughout this report, because it is the clearest guide we know to how a genuine technological boom can be right about the future and still ruin the people who pay for it.
Third-quarter results from the hyperscalers are due later this month, with Amazon reporting on 29 October, and their capital spending guidance for 2027 will be the most important signal for everything that follows. We will be watching it closely, and we would encourage readers to do the same.
This post is for paid subscribers
Subscribe to Santiago Capital Pro to read the rest.
